Your effort deserves
Real Results.

Turn your study hours into data you can use. EstudyLog gives you actionable insights to optimize your routine: find your biological peak hours, spot syllabus gaps, and hit your target GPA without the guesswork.

Download on App Store
App Store 5.0 · iOS

How We Find Your Peak

1. Log & Rate: Start the timer. When you finish, rate your focus (1-5 stars). Did you flow, or did you struggle?

2. The Analysis: The engine correlates your ratings with the time of day, identifying patterns in your mental energy.

3. The Optimization: Open Insights to see your "Biological Peak" (e.g., 4 AM–8 AM). Schedule your hardest topics then.

The Result

Visualized Focus

This isn't just a graph; it's a permission slip to rest when you're tired and grind when you're sharp.

The gradient bars show volume (length) and quality (color). Spot the difference between "busy work" (long bars, low focus) and "deep work" (high focus).

(numbers!, not vibes)

EstudyLog Insights tab in dark mode showing streak heatmap, weekly focus bars, biological peak hours callout, and recent sessions with focus ratings
EstudyLog syllabus coverage rings with topic mastery percentages, course outline coverage, and red gaps for unstudied material
Syllabus Coverage

See Your Blind Spots

Stop saying "I studied Biology for 10 hours." That doesn't mean you're ready for the exam—it just means you sat there. EstudyLog maps your time to specific topics in your course outline. Watch the progress rings turn green as you move from "Tumor immunology" to "Tolerance." Know exactly what percentage of the material you have mastered, and spot the red gaps before test day.

(numbers!, not vibes)

Habit Analysis

Stop Passive Reading

You covered the syllabus, but did you actually learn it? Passive reading feels like work, but active practice is what gets the grades. See the breakdown of your study methods (Reading vs. Practice vs. Review). If your chart is 100% "Reading," you are falling into a trap. Use the data to balance your routine and force yourself into active recall.

(numbers!, not vibes)

EstudyLog habit analysis course detail screen with study method breakdown, mastery circles by topic, and active recall vs passive reading balance
EstudyLog outcome predictor grade calculator showing required score, weight breakdown, and GPA safeguard target for the final exam
New Feature

Outcome Predictor

Remove the anxiety. Input your current grades and weights to instantly see exactly what score you need on the final exam to keep your GPA safe. Know the number. If you need a 72% to keep your A, stop stressing like you need a 98%. If you need a 95%, know it now so you can start grinding.

(numbers!, not vibes)

Don't Break The Chain

Watch your contribution graph fill up with green squares. It turns invisible labor into visible proof and makes consistency addictive.

EstudyLog dashboard with streak card, streak heatmap, progress chart, and recent study sessions list EstudyLog calendar streak view with contribution heatmap and daily study durations
Download on App Store

What students are saying

I love the app, just what Ive been looking for. Super straightforward and no overwhelming useless features. Thank you ❤️

Ilyusha3 — 5★

I have used the app for a week now and it has helped me so much on knowing how much time I am dedicating to each one of my classes. There are also many other features that I like but I want to keep my review short. Anyways, I definitely recommend it to any student!

startlearning123 — 5★

I can’t believe they made an app so complete and free, thank you to whoever made this happen.

bonnieee6 — 5★